Our work: from the application to running operation.
Six services that build on each other. Each can be commissioned on its own, but they work best together.
VisualisationLicence support
We prepare your licensing procedure and stay at your side until inspection. The decision lies with the authority; our job is that nothing is missing and nothing contradicts itself.
- Requirements check for your country and licence type
- Application documents: site, security, hygiene, procedures
- Preparation of and attendance at authority meetings
- Preparation for the on-site inspection
You receiveA complete, consistent application file and a list of open points with responsibilities.
VisualisationFacility planning
A facility is approved and operated along its routes: where staff walk, where material moves, where clean meets unclean. We plan this first and the walls second.
- Zoning to GACP and GMP requirements
- Staff and material flow, hygiene airlocks
- Power, water, climate and security concept
- Expansion stages on the same site
You receiveLayout plans, room schedule, technical connection list and a phased build schedule.
Visualisation3D modelling
We build your facility as a 3D model before a single container is ordered. Authorities, funders and your own team see the same thing and talk about the same thing.
- Site model true to scale with all units
- Walk-through of routes and zones
- Views for application and presentation
- Variants for each expansion stage
You receiveA 3D model with stills and views for your documents.
VisualisationGrow & genetics
Consistent product comes from consistent work. Together with our cultivation partners we set up cultivars, recipes and procedures and train your team on them.
- Selection of cultivars and mother plants
- Climate and irrigation recipes per phase
- Work instructions for every step of the cycle
- Training on site and remote
You receiveA cultivation plan per cycle and trained staff.
VisualisationOperation & remote monitoring
The units report climate, substrate and irrigation continuously. Our remote team watches along and steps in when values drift.
- Central dashboard for all units
- Alarms on deviations
- Cycle documentation for audits
- Support through the first harvests
You receiveOngoing monitoring and a documented record of every cycle.
VisualisationFunding preparation
Money follows clarity. We prepare the technical side of your project so that banks and investors can assess it: what is built, when, in which stages. We do not give investment advice.
- Technical project description
- Capital requirement per expansion stage
- Schedule from payment to first harvest
- Answers to technical questions from funders
You receiveA project file that a third party can follow without us in the room.
Five steps to a running facility.
The order is fixed; the pace depends on authority, site and funding.
First call
Project, site, status. 30 minutes.
Assessment
What exists, what is missing, what is realistic.
Plan & application
Facility plan, 3D model, documents for the authority.
Delivery & set-up
Units arrive 3–4 months after payment.
Operation
Training, first cycles, ongoing monitoring.